PPM and Project Management terms: the complete A–Z glossary
Explore 581 essential project management terms and definitions, from Agile and Scrum to project portfolio management (PPM), resource planning, and strategic management. Find clear, practical explanations of the concepts, methodologies, and acronyms every project professional should know.
What are Project Management Terms?
Project management terms are the concepts, methodologies, acronyms, and technical expressions used to plan, execute, monitor, and deliver projects successfully. From defining project scope and managing resources to tracking performance and mitigating risks, this terminology provides a common language for project teams, PMOs, and business leaders.
But understanding project management terminology goes beyond knowing definitions. When everyone speaks the same language, organizations can improve collaboration, establish clearer responsibilities, make more informed decisions, and keep projects aligned with business objectives.
Whether you’re new to project management or an experienced professional looking to clarify a specific concept, this project management glossary brings together 581 terms and definitions covering traditional methodologies, Agile frameworks, project portfolio management (PPM), strategic planning, and more.
Browse the glossary alphabetically to find the definitions you need and build a stronger understanding of the practices that help organizations deliver projects successfully.
Project Management Terms
0-9 – Project Management Terms
3 horizons model – A strategy framework developed by McKinsey that balances investment across three time frames: Horizon 1 defends and extends the core business, Horizon 2 builds emerging opportunities, and Horizon 3 creates options for future growth.
A – Project Management Terms
Action plan – A documented list of the specific steps, owners, and deadlines needed to reach a defined objective or resolve an issue.
Actual cost of work performed (ACWP) – The total cost actually incurred for the work completed in a given period. Also called actual cost (AC), it is one of the three core measures in earned value management.
Actual duration – The amount of time, in working days, between the actual start date of an activity and its actual finish date or the current status date.
Actual effort – The number of hours or person-days actually spent on a task or project to date, usually captured through timesheets.
Actual finish date – The date on which an activity or project was actually completed.
Actual start date – The date on which work on an activity or project actually began.
Adaptive project management – An approach that plans and delivers work in short cycles and adjusts scope, schedule, and priorities as new information emerges, rather than following a fixed plan.
Agile – An iterative approach to managing projects and developing products that delivers value in small increments, welcomes changing requirements, and relies on close collaboration with customers and self-organizing teams.
Agile coach – A practitioner who helps teams and leaders adopt Agile values, practices, and ways of working, and supports continuous improvement across the organization.
Agile estimation – Relative sizing techniques used by Agile teams, such as story points, T-shirt sizes, and planning poker, to estimate the effort needed to deliver backlog items. (See also planning poker)
Agile Manifesto – A 2001 statement of four values and twelve principles for software development that prioritizes individuals and interactions, working software, customer collaboration, and responding to change.
Agile metrics – Measures used to track the progress, quality, and predictability of Agile teams, such as velocity, cycle time, lead time, and burndown.
Agile mindset – A way of thinking based on Agile values such as collaboration, learning, adaptability, transparency, and a focus on delivering customer value.
Agile release train (ART) – In the Scaled Agile Framework (SAFe), a long-lived team of Agile teams that plans, commits, and delivers value together on a shared cadence. (See also program increment)
Agile stage-gate – A hybrid model that combines the governance checkpoints of the stage-gate process with Agile sprints inside each stage, often used in new product development.
AI assistant – A software capability that uses artificial intelligence to help users complete tasks, such as answering questions, summarizing project data, drafting reports, or suggesting next actions.
Ansoff matrix – A strategic planning tool that maps growth options across four strategies: market penetration, market development, product development, and diversification.
Artifact – Any document, template, record, or output created during a project. In Scrum, the three artifacts are the product backlog, the sprint backlog, and the increment.
Audit – An independent, structured examination of a project, process, or deliverable to confirm compliance with standards, policies, or requirements.
Authorized work – Work that has been formally approved and funded to proceed, typically through a signed contract, charter, or work authorization.
B – Project Management Terms
Backlog – A prioritized list of work items, such as features, user stories, or tasks, that are waiting to be completed. (See also product backlog and sprint backlog)
Balanced matrix – An organizational structure in which the project manager and the functional manager share authority over project resources and decisions.
Balanced scorecard – A strategic performance management framework that tracks objectives and measures across four perspectives: financial, customer, internal processes, and learning and growth.
Baseline – The approved version of a project’s scope, schedule, or cost plan, used as the reference point to measure performance. Changes to a baseline require formal change control.
Baseline finish date – The originally approved finish date of an activity or project, as recorded in the schedule baseline.
Baseline start date – The originally approved start date of an activity or project, as recorded in the schedule baseline.
BCG matrix – A portfolio planning tool from the Boston Consulting Group that classifies products or business units as stars, cash cows, question marks, or dogs, based on market growth and relative market share.
Benefit – A measurable improvement that results from a project outcome and is perceived as an advantage by one or more stakeholders. (See also disbenefit)
Benefit-cost ratio (BCR) – A financial indicator that compares the present value of a project’s benefits to the present value of its costs. A ratio above 1 suggests the benefits outweigh the costs.
Benefits management plan – A document that describes how and when the benefits of a project or program will be delivered, measured, and sustained.
Benefits realization – The process of ensuring that the outcomes of a project or program produce the expected benefits, often tracked well after the project has closed.
Bottleneck – A point in a process or workflow where capacity is limited, causing delays and reducing the throughput of the entire system.
Brainstorming – A group technique used to generate a large number of ideas, risks, or solutions in a short time, without judging them during the session.
Budget – The approved estimate of the total cost of a project, phase, or activity, usually broken down by time period and cost category.
Budget at completion (BAC) – The sum of all budgets established for the work to be performed. It represents the total planned value of the project.
Budget burndown – A chart that shows how much of the budget remains over time, compared with the planned rate of spending.
Budget element – A category used to group and track costs within a budget, such as labor, materials, equipment, or travel.
Budget tracking – The ongoing comparison of actual spending against the approved budget to identify variances early and support corrective action.
Budgeting – The process of aggregating estimated costs of activities or work packages to establish an authorized cost baseline.
Build, own, operate, transfer (BOOT) – A project delivery and financing model in which a private party builds, owns, and operates a facility for a set period before transferring it to the public sector or client.
Building information modelling (BIM) – A digital process for creating and managing information about a built asset across its life cycle, using a shared 3D model.
Business analysis – The practice of identifying business needs, analyzing problems, and recommending solutions that deliver value to stakeholders.
Business case – A documented justification for a project that describes the expected benefits, costs, risks, and options, and is used to decide whether the investment is worthwhile.
Business continuity plan – A plan that describes how an organization will keep critical operations running during and after a disruption or disaster.
Business model – A description of how an organization creates, delivers, and captures value.
Business model canvas – A one-page strategic template with nine building blocks, such as customer segments, value propositions, and revenue streams, used to describe or design a business model.
Business process – A set of related activities that together produce a specific service or product for a customer.
Business process modeling (BPM) – The practice of representing an organization’s processes visually, often with flowcharts or standard notations, to analyze and improve them.
Business readiness – The degree to which an organization, its people, and its processes are prepared to adopt and use a new solution when it goes live.
Business requirements – High-level statements of the needs of the organization, describing why a project is being undertaken and what it must achieve.
Business requirements document (BRD) – A formal document that describes the business needs, objectives, and expected outcomes a solution must meet.
Business-as-usual (BAU) – The normal, ongoing operations of an organization, as opposed to project work that introduces change.
C – Project Management Terms
Capacity planning – The process of comparing the available capacity of resources with current and future demand, to decide which work the organization can take on.
CAPEX – Capital expenditure. Money spent to acquire, upgrade, or build long-term assets, such as equipment, buildings, or capitalized software.
Case study – A detailed description of a real project or situation, used to share lessons, demonstrate results, or teach good practice.
Champion – A senior person who actively promotes a project or change, secures support, and helps remove obstacles.
Change authority – A person or group delegated to approve or reject change requests within agreed limits.
Change control – A formal process for identifying, documenting, evaluating, and approving or rejecting changes to a project’s baselines.
Change control board (CCB) – A formally constituted group responsible for reviewing, evaluating, and approving, deferring, or rejecting changes to a project.
Change freeze – A period during which no changes may be made to a system or baseline, typically before a release or go-live.
Change log – A record of all change requests submitted during a project and their current status.
Change management – A structured approach to preparing, supporting, and helping individuals, teams, and organizations adopt a change. (See also change control)
Change management plan – A document that describes how changes will be requested, assessed, approved, and communicated during a project.
Change request – A formal proposal to modify a document, deliverable, or baseline.
Closeout – The final phase of a project, in which deliverables are handed over, contracts are closed, lessons are captured, and resources are released.
Communications log – A record of key communications sent and received during a project.
Communications management – The processes needed to ensure that project information is planned, created, distributed, stored, and monitored in a timely and appropriate way.
Communications management plan – A document that describes what information will be shared, with whom, how often, through which channels, and by whom.
Concept – The first phase of a project life cycle, in which an idea is explored and its value and feasibility are assessed at a high level.
Conceptual project planning – Early, high-level planning that defines the general approach, scope, and rough estimates of a project before detailed planning begins.
Configuration audit – A check that confirms a product conforms to its configuration documentation and that records are accurate.
Configuration control – The activities that control changes to configuration items after their configuration documentation has been formally approved.
Configuration identification – The process of selecting configuration items, assigning them unique identifiers, and recording their characteristics.
Configuration item – Any component of a product or system that is managed under configuration management, such as a document, software module, or piece of hardware.
Configuration management – The discipline of identifying, controlling, recording, and auditing the functional and physical characteristics of a product and its components.
Configuration status accounting – The recording and reporting of the status of configuration items and of proposed and approved changes to them.
Conflict management – The process of identifying and resolving disagreements between team members or stakeholders in a constructive way.
Contingency – An amount of time, money, or other resources set aside to deal with identified risks if they occur.
Contingency plan – A predefined set of actions to be taken if a specific risk occurs.
Contingency reserve – Budget or time included in the baseline to cover identified risks that the project has accepted. (See also management reserve)
Continuous improvement – An ongoing effort to improve products, services, or processes through small, regular, incremental changes.
Core process – A process that directly creates value for customers and is central to the organization’s purpose.
Cost account – A management control point where scope, budget, actual cost, and schedule are integrated and compared with earned value.
Cost account manager (CAM) – The person responsible for planning, monitoring, and controlling the work, budget, and schedule of a cost account.
Cost baseline – The approved, time-phased version of the project budget, used to measure cost performance.
Cost breakdown structure (CBS) – A hierarchical breakdown of project costs by category, often aligned with the work breakdown structure.
Cost code – A unique identifier assigned to a cost item so that it can be tracked and reported.
Cost control system – The procedures and tools used to monitor project spending, compare it with the budget, and manage changes to the cost baseline.
Cost curve – A graph of cumulative project cost over time, which typically forms an S shape, also known as an S-curve.
Cost engineering – The application of engineering judgment and scientific principles to cost estimation, cost control, and profitability.
Cost estimation – The process of developing an approximation of the monetary resources needed to complete project work.
Cost management – The processes involved in planning, estimating, budgeting, financing, managing, and controlling costs so the project is completed within the approved budget.
Cost of capital – The minimum return an organization must earn on an investment to satisfy its lenders and shareholders, often used as the discount rate in investment appraisal.
Cost performance index (CPI) – A measure of cost efficiency calculated as earned value divided by actual cost. A CPI below 1 means the project is over budget.
Cost variance (CV) – The difference between earned value and actual cost. A negative value means the work cost more than planned.
Cost-benefit analysis – A comparison of the expected costs and benefits of a decision or project to determine whether it is worthwhile.
Critical chain project management (CCPM) – A scheduling method that considers both task dependencies and resource constraints, and uses shared buffers instead of padding individual task estimates.
Critical incident stress debriefing (CISD) – A structured group discussion held after a traumatic or highly stressful event to help those involved process the experience.
Critical path – The longest sequence of dependent activities in a project, which determines the shortest possible project duration. A delay on the critical path delays the project.
Critical path activity – Any activity on the critical path. It has zero or negative total float.
Critical path method (CPM) – A scheduling technique that calculates the earliest and latest start and finish dates of each activity to identify the critical path and the float of each activity.
Critical success factor (CSF) – A condition or element that must be in place for a project or organization to achieve its objectives.
Cross-functional team – A team whose members come from different functions or disciplines and together have all the skills needed to deliver the work.
Current finish date – The current best estimate of when an activity will finish, reflecting progress to date.
Current start date – The current best estimate of when an activity will start, reflecting progress to date.
Current state analysis – An assessment of how processes, systems, and capabilities work today, used as a starting point for planning improvements. (See also gap analysis)
Customer – The person or organization that will use or pay for the project’s product, service, or result.
Customer journey map – A visual representation of the steps a customer or user goes through when interacting with a product, service, or organization.
D – Project Management Terms
Daily stand-up – A short daily meeting, usually 15 minutes, in which team members share progress, plans for the day, and any blockers.
Data flow diagram – A diagram that shows how data moves through a system, including its inputs, outputs, processes, and data stores.
Decision bias – A systematic error in judgment, such as optimism bias or anchoring, that can distort estimates and decisions.
Decision model – A structured representation of the criteria, logic, and data used to reach a decision.
Decision tree analysis – A diagram and calculation method used to compare alternative decisions by mapping their possible outcomes, probabilities, and values.
Definition of done (DoD) – A shared, explicit set of criteria that a backlog item must meet before it is considered complete.
Definition of ready (DoR) – A shared set of criteria that a backlog item must meet before the team accepts it into a sprint.
Deliverable – Any unique and verifiable product, result, or capability that must be produced to complete a process, phase, or project.
Delphi technique – A method for reaching consensus among experts through several anonymous rounds of questionnaires, with feedback shared between rounds.
Demand forecasting – The process of predicting future demand for projects, products, or services, to support planning and capacity decisions.
Demand intake – The process of capturing, registering, and initially screening new requests for projects or work before they are evaluated and prioritized.
Demand management – The process of capturing, evaluating, prioritizing, and approving requests for new work, so that the organization invests in the right initiatives.
Demand modeling – The use of data and assumptions to model expected demand for resources, projects, or services over time.
Dependency – A logical relationship between two activities or projects in which one cannot start or finish until the other has started or finished.
Dependency management – The process of identifying, tracking, and managing dependencies between tasks, teams, projects, or programs.
Design (stage) – The phase of a project in which the solution is specified in detail, based on the agreed requirements.
Design-build – A project delivery method in which a single contractor is responsible for both the design and the construction of a project.
Development environment – The set of tools, servers, and settings used by developers to build and test software before it moves to testing or production.
Development team – The people who do the work of building and delivering the product. In Scrum, these are called the developers.
DevOps – A set of practices and a culture that brings development and IT operations together to deliver software faster and more reliably through automation and collaboration.
Digital project management – The management of projects that deliver digital products such as websites, apps, or platforms, or the use of digital tools to manage projects.
Digital transformation – The integration of digital technology into all areas of an organization, fundamentally changing how it operates and delivers value.
Disbenefit – A measurable outcome of a project that is perceived as negative by one or more stakeholders. (See also benefit)
Discrete effort – Work that produces a specific, measurable output and can be directly planned and measured. (See also level of effort)
Discretionary dependency – A dependency based on best practice or preference rather than a hard logical need. Also known as a preferred or soft logic dependency.
Document control – The process of managing documents throughout their life cycle, including versioning, approval, distribution, and storage.
E – Project Management Terms
Early finish date – The earliest date on which an activity can finish, based on the network logic and schedule constraints.
Early start date – The earliest date on which an activity can start, based on the network logic and schedule constraints.
Earned hours – The planned hours for the work actually completed, used to measure progress in labor-based projects.
Earned schedule – An extension of earned value management that measures schedule performance in units of time rather than cost.
Earned value (EV) – The value of the work actually completed, expressed in terms of the budget approved for that work. Also known as budgeted cost of work performed (BCWP).
Earned value management (EVM) – A method that integrates scope, schedule, and cost to measure project performance and progress, by comparing planned value, earned value, and actual cost.
Effort – The number of labor units, such as hours or person-days, required to complete an activity or project. Effort is different from duration.
Effort-driven activity – An activity whose duration changes when resources are added or removed, while the total work stays the same.
Enterprise project management office (EPMO) – A PMO at the organization level that sets standards, governance, and portfolio oversight for all projects and programs.
Epic – A large body of work that can be broken down into smaller user stories or features.
Epic breakdown – The process of splitting an epic into smaller features or user stories that can be delivered in a sprint.
Epic owner – In SAFe, the person responsible for defining an epic, building its business case, and guiding it through the portfolio Kanban.
Escalation – The process of raising an issue or risk to a higher level of authority when it exceeds the tolerance or authority of the current level.
ESG – Environmental, social, and governance. A set of criteria used to assess an organization’s or project’s sustainability, social impact, and ethical governance.
Estimate at completion (EAC) – The expected total cost of completing all work, calculated as actual cost to date plus the estimate to complete.
Estimate to complete (ETC) – The expected cost or effort needed to finish all the remaining project work.
Estimating funnel – A model showing that estimates are highly uncertain at the start of a project and become more accurate as the project progresses. Also known as the cone of uncertainty.
Estimation – The process of forecasting the duration, effort, or cost of work, based on the information available.
Estimation techniques – Methods used to produce estimates, such as analogous, parametric, bottom-up, three-point estimating, and expert judgment.
Evidence-based management (EBM) – A framework from Scrum.org that helps organizations measure, manage, and increase the value they deliver, using evidence rather than assumptions.
Exception management – A management approach in which issues are only escalated when they exceed agreed tolerances for time, cost, scope, quality, risk, or benefits.
Executing process group – The group of processes performed to complete the work defined in the project management plan.
Execution phase – The phase of a project in which the planned work is carried out and deliverables are produced.
Expected monetary value (EMV) – A statistical technique that calculates the average outcome of a risk or decision by multiplying the value of each possible outcome by its probability.
External constraint – A limitation that comes from outside the project or organization, such as regulations, market conditions, or weather.
External dependency – A relationship between project activities and factors outside the project team’s control, such as suppliers or regulatory approvals.
External environment – The factors outside an organization, such as economic, political, social, and technological conditions, that may affect a project.
External quality assurance (EQA) – An independent review of quality performed by a party outside the project or organization.
External suppliers – Organizations outside the company that provide goods or services to the project.
F – Project Management Terms
Facility – A physical building, plant, or installation created or used by a project.
Feasibility study – An analysis of whether a proposed project is technically, financially, and operationally viable, usually performed before investment decisions are made.
Feature – A distinct piece of functionality that delivers value to users and is typically made up of several user stories.
Feature breakdown structure – A hierarchical decomposition of a product into its features and sub-features.
Financial management – The planning, organizing, controlling, and monitoring of financial resources to achieve project or organizational objectives.
Financial scheduling – The planning of when funds will be needed and spent over the life of a project, to ensure cash is available when required.
Financing and funding – The means by which the money needed to deliver a project is obtained, such as internal budget, loans, grants, or investors.
Finish date – The point in time when an activity or project is completed. It can be planned, forecast, baseline, or actual.
Finish-to-finish (FF) – A dependency in which the successor activity cannot finish until the predecessor activity has finished.
Finish-to-start (FS) – The most common dependency, in which the successor activity cannot start until the predecessor activity has finished.
Flight levels – A strategic planning model by Klaus Leopold that describes three levels at which work is coordinated: operational (team), coordination (across teams), and strategic (portfolio).
Float – The amount of time an activity can be delayed without delaying the project finish date (total float) or the next activity (free float). Also known as slack.
Flowchart – A diagram that shows the steps of a process or workflow and the order in which they occur.
Forecast – An estimate of future conditions or results, such as cost or completion date, based on performance to date.
Functional manager – The person who manages a department or functional unit, such as engineering or finance, and often controls the resources assigned to projects.
Functional organization – An organizational structure in which staff are grouped by specialty and the functional manager holds most of the authority over project work.
Functional requirements – Requirements that describe what a system or product must do, such as specific behaviors, functions, or features.
Functional specification – A document that describes in detail how a system will meet the functional requirements.
G – Project Management Terms
Gantt chart – A bar chart that shows project activities on a timeline, including their start and finish dates, durations, and dependencies.
Gap analysis – A comparison of the current state with the desired future state to identify the gaps that need to be closed.
Gate – A point at the end of a stage or phase where a decision is made about whether the project should continue, change direction, or stop.
Gate review – A formal review held at a gate to assess progress, deliverables, and the business case before approving the next phase.
Goal – A broad, long-term aim that a project or organization wants to achieve.
Goal setting – The process of defining specific, measurable targets for individuals, teams, or the organization.
Go/no-go – A decision point at which stakeholders decide whether a project, phase, or release should proceed.
Governance – The framework of roles, responsibilities, policies, and decision-making processes used to direct and control a project, program, or portfolio.
Governance audit – A review of whether governance structures and processes are in place and working as intended.
Governance framework – The structure of decision-making bodies, roles, rules, and processes that define how governance is carried out.
Governance, risk, and compliance (GRC) – An integrated approach to aligning governance, managing risk, and meeting regulatory requirements across an organization.
Grant management – The process of applying for, administering, tracking, and reporting on grant-funded projects.
H – Project Management Terms
Handover – The transfer of a completed deliverable, along with ownership and responsibility, from the project team to the customer or operations team.
Health and safety plan – A document that sets out how health and safety risks will be managed on a project.
Health and safety risk assessment – A systematic evaluation of hazards that may cause harm to people, and of the measures needed to control them.
Health, safety, and environmental (HSE) management – The processes used to protect people and the environment from harm during project and operational activities.
HERMES – A project management method developed by the Swiss federal administration for IT, service, and organizational projects.
Hoshin Kanri framework – A strategic planning method that aligns an organization’s long-term goals with yearly objectives and daily work through a cascade of plans and regular reviews.
Hybrid project management – An approach that combines elements of predictive (waterfall) and adaptive (Agile) methods to fit the needs of a project.
I – Project Management Terms
Idea management – The process of capturing, developing, evaluating, and selecting ideas for innovation or new projects.
Impact analysis – An assessment of the effect that a change, risk, or issue would have on a project’s scope, schedule, cost, and quality.
Impact mapping – A visual planning technique that links goals to actors, impacts, and deliverables, to help teams focus on work that creates the desired outcome.
Imposed finish – A finish date set by an external requirement, such as a contract or regulation, rather than by the schedule logic.
Imposed start – A start date set by an external requirement rather than by the schedule logic.
Incremental development – An approach in which a product is built and delivered in successive pieces, each adding usable functionality.
Incremental funding – A funding approach in which money is released in stages, based on progress or results at each stage.
Infrastructure – The underlying physical or technical systems, such as networks, servers, buildings, or roads, needed to support operations.
Initiation phase – The first phase of a project, in which it is defined, authorized, and its charter is approved.
Innovation management – The systematic process of managing ideas from creation through development to implementation.
Inputs – Items, internal or external, required by a process before it can proceed, such as documents, data, or resources.
Integration – The coordination of all project elements, processes, and systems so they work together as a whole. In software, it also refers to connecting one system with another.
Integration management plan – A plan describing how the various project elements, subsidiary plans, and processes will be coordinated.
Interface management – The management of the points where different work packages, contractors, systems, or organizations interact.
Interface management plan – A document that defines how interfaces will be identified, managed, and controlled during a project.
Investment – The commitment of money or resources to a project in expectation of future benefits.
Investment appraisal – The evaluation of the financial attractiveness of a project, using techniques such as NPV, IRR, and payback period.
Investment decision – A decision to commit funds to a project or portfolio item, usually based on the business case.
Ishikawa diagram – A cause-and-effect diagram, also called a fishbone diagram, used to identify the possible root causes of a problem.
Issue – A current condition or situation that may have an impact on project objectives and needs to be addressed.
Issue log – A document used to record and track issues, their owners, actions, and status.
Issue management – The process of identifying, recording, analyzing, and resolving issues.
Issue-based strategic planning – A strategic planning approach that focuses on the most critical issues an organization faces and develops strategies to address them.
IT portfolio management – The application of portfolio management to IT investments, projects, and assets to align them with business strategy.
Iteration – A fixed time period, usually one to four weeks, in which a team delivers a potentially usable increment of work. Called a sprint in Scrum.
Iterative development – An approach in which a product is developed through repeated cycles, with each cycle refining the product based on feedback.
J – Project Management Terms
Joint application development (JAD) – A method that brings users and developers together in facilitated workshops to define requirements and design a system.
Just in time (JIT) – A production and inventory approach in which materials and work are delivered only when needed, to reduce waste.
K – Project Management Terms
Kanban board – A visual board, physical or digital, that shows work items as cards moving through columns representing stages of a workflow.
Key performance indicator (KPI) – A measurable value used to assess how well a project or organization is achieving its objectives.
Kickoff meeting – The first meeting of the project team and key stakeholders, held to align on objectives, scope, roles, and plans.
Knowledge area – In earlier editions of the PMBOK Guide, a defined area of project management, such as scope, schedule, or risk, described by its processes and practices.
Knowledge management – The process of creating, sharing, using, and managing the knowledge and information of an organization.
Knowledge transfer – The process of passing knowledge and skills from one person or team to another, often during handover.
L – Project Management Terms
Lag – The amount of time a successor activity must wait after its predecessor before it can start or finish.
Late finish date – The latest date an activity can finish without delaying the project completion date.
Late start date – The latest date an activity can start without delaying the project completion date.
Lean – A management philosophy focused on maximizing customer value while minimizing waste.
Lean budgeting – A SAFe approach in which funding is allocated to value streams rather than to individual projects, giving teams more flexibility.
Lean canvas – A one-page business plan template, adapted from the business model canvas, focused on problems, solutions, key metrics, and unfair advantage.
Lessons learned – The knowledge gained during a project that shows what went well and what should be done differently in future projects.
Level of effort (LOE) – Support-type work that does not produce definitive end products, such as project management, and is measured by the passage of time. (See also discrete effort)
Life cycle – The series of phases a project goes through from its start to its completion.
Life cycle cost – The total cost of a product or asset over its entire life, including acquisition, operation, maintenance, and disposal.
Linear scheduling method (LSM) – A scheduling technique used for repetitive linear projects, such as roads or pipelines, that shows work progress by location and time.
M – Project Management Terms
Management plan – A plan that describes how a specific aspect of a project, such as scope, risk, or quality, will be defined, monitored, and controlled.
Management process – A process used to plan, organize, direct, and control work, as opposed to the technical processes that produce deliverables.
Management reserve – An amount of budget or time held outside the performance baseline to cover unforeseen work within the project scope. (See also contingency reserve)
Management review – A periodic review by management to assess project status, performance, and the continued validity of the business case.
Market analysis – A study of a market’s size, trends, customers, and competitors, used to support product and investment decisions.
Masterplan – A high-level, integrated plan that coordinates all major projects, phases, and milestones of a large program or development.
Matrix diagram – A quality tool that shows the relationships between two or more groups of items in a grid.
Matrix organization – An organizational structure in which staff report to both a functional manager and a project manager. It can be weak, balanced, or strong.
Maturity model – A framework that describes the stages an organization goes through as its capabilities in an area, such as project management, become more developed and repeatable.
McKinsey 7S framework – A strategic planning model that analyzes organizational effectiveness through seven interconnected elements: strategy, structure, systems, shared values, style, staff, and skills.
MCP server – A server that implements the Model Context Protocol, an open standard that lets AI assistants securely connect to external tools and data sources, such as project management software.
Megaproject – A very large-scale investment project, typically costing over USD 1 billion, that takes many years to deliver and affects millions of people.
Methodology – A system of practices, techniques, procedures, and rules used to manage projects, such as PRINCE2, Scrum, or a company’s own method.
Mid-sprint review – An informal check-in held halfway through a sprint to assess progress toward the sprint goal and adjust plans if needed.
Milestone – A significant point or event in a project, such as the completion of a major deliverable. A milestone has zero duration.
Milestone schedule – A summary schedule that shows only the major milestones of a project and their target dates.
Minimum marketable feature (MMF) – The smallest set of functionality that delivers real value to users and can be released on its own.
Minimum viable product (MVP) – The simplest version of a product that can be released to test a hypothesis and gather validated learning from real users.
Mission statement – A short statement of an organization’s purpose, describing what it does, for whom, and why.
Monitoring and controlling process group – The processes used to track, review, and regulate project progress and performance, identify changes, and start corrective actions.
Monte Carlo simulation – A technique that runs thousands of simulations with random values for uncertain variables to calculate the probability of achieving project cost and schedule targets.
MoSCoW method – A project prioritization technique that sorts requirements into must have, should have, could have, and won’t have this time.
N – Project Management Terms
Nadler-Tushman congruence model – An organizational diagnostic model that assesses how well an organization’s work, people, formal structure, and culture fit together to deliver its strategy.
Near-critical activity – An activity with a small amount of total float, which could easily become critical if delayed.
Near-critical path – A sequence of activities whose total float is close to zero, so that it could become the critical path if delays occur.
Net cash flow – The difference between cash coming in and cash going out over a given period.
Net present value (NPV) – The present value of all future cash inflows minus the present value of all cash outflows. A positive NPV indicates a project is expected to add value.
Network analysis – The technique of analyzing a project network diagram to calculate early and late dates, float, and the critical path.
Network diagram – A graphical representation of the logical relationships between project activities.
New product development (NPD) – The complete process of bringing a new product to market, from idea generation through design, development, and launch.
Non-functional requirement (NFR) – A requirement that describes how a system should perform, such as its security, performance, usability, or reliability, rather than what it should do.
Nonlinear management (NLM) – A management approach that combines adaptive and traditional methods and adjusts its style to the level of uncertainty in each situation.
Non-recurring costs – One-time costs, such as design or setup costs, that do not repeat during the life of a project or product.
O – Project Management Terms
Objective – A specific, measurable result that a project is designed to achieve, usually within a set timeframe.
OGSM framework – A strategic planning framework that links objectives, goals, strategies, and measures on a single page.
OKR – Objectives and key results. A goal-setting framework in which qualitative objectives are paired with a small number of measurable key results that show progress.
Onboarding – The process of bringing a new team member, user, or customer up to speed so they can contribute or use a product effectively.
Operational risk – The risk of loss resulting from failed internal processes, people, systems, or external events.
Operations and maintenance (O&M) – The ongoing activities needed to run and maintain an asset or system after the project has delivered it.
Operations management – The administration of business practices to ensure the organization runs efficiently and delivers products and services consistently.
OPEX – Operating expenditure. The ongoing costs of running a business, product, or system, such as salaries, rent, licenses, and maintenance.
Opportunity – A risk that would have a positive effect on one or more project objectives if it occurred.
Opportunity cost – The value of the next best alternative given up when a choice is made.
Opportunity management – The process of identifying, assessing, and exploiting opportunities to increase the value of a project.
Optimistic duration – The shortest realistic time an activity could take if everything goes well. It is used in three-point and PERT estimates.
Organizational breakdown structure (OBS) – A hierarchical representation of the project organization, showing which organizational units are responsible for which work packages.
Organizational culture – The shared values, beliefs, and behaviors that shape how people work within an organization.
Organizational enabler – A structural, cultural, technological, or human resource practice that supports the achievement of strategic goals, such as a PMO or a governance framework.
Organizational planning – The process of identifying, documenting, and assigning project roles, responsibilities, and reporting relationships.
Organizational process assets (OPA) – The plans, processes, policies, templates, and knowledge bases of an organization that can be used to manage projects.
Organizational structure – The way an organization arranges its people and reporting lines, such as functional, matrix, or projectized.
Original budget – The budget approved at the start of a project, before any changes.
Original duration – The duration of an activity as first planned, before any updates or progress.
Other direct costs (ODC) – Direct costs that are not labor or materials, such as travel, equipment rental, or subcontracts.
Outcome – The result of change, normally affecting real-world behavior or circumstances, that is enabled by a project’s outputs.
Outcome mapping – A planning and evaluation approach that focuses on changes in the behavior, relationships, and actions of the people a project works with.
Output – A specialist product, deliverable, or result produced by a project.
Output specification – A description of what a deliverable must achieve, focused on required performance rather than on how it will be built.
Overhead costs – Indirect costs, such as rent, utilities, and administration, that support the business but are not directly tied to a specific project activity.
Owner – The person or organization that commissions, funds, and will own the result of a project. Also used for the person accountable for a risk, task, or product.
P – Project Management Terms
Pareto analysis – A technique based on the 80/20 rule that identifies the small number of causes responsible for most problems, often shown in a Pareto chart.
Payback period – The time it takes for the cash inflows from a project to repay its initial investment.
Peer review – An evaluation of work, such as a document or code, by colleagues with similar expertise to identify defects and improvements.
Percent complete – An estimate, expressed as a percentage, of how much of an activity or project has been completed.
Performance management – The ongoing process of setting objectives, monitoring progress, and improving the performance of individuals, teams, projects, or portfolios.
Performance measurement baseline (PMB) – The integrated scope, schedule, and cost baselines used to measure and manage project performance in earned value management.
Performance measurement techniques – Methods used to assess project performance against the plan, such as earned value analysis, variance analysis, and trend analysis.
Performance reporting – The process of collecting and distributing information about project performance, including status, progress, and forecasts.
Performance review – A meeting or assessment that compares actual project performance with the baseline to identify variances and corrective actions.
PERT (program evaluation and review technique) – An estimating technique that uses a weighted average of optimistic, most likely, and pessimistic estimates to calculate expected activity durations.
PESTLE analysis – A strategic planning framework for analyzing the political, economic, social, technological, legal, and environmental factors that may affect an organization or project. PEST is the shorter four-factor version.
Phase-gate – A project management approach in which a project is divided into phases separated by gates, where decisions are made to continue, change, or stop. Also called stage-gate.
Planned activity – An activity included in the project schedule that has not yet started.
Planned value (PV) – The authorized budget assigned to the work scheduled to be completed by a given date. Also known as budgeted cost of work scheduled (BCWS).
Planning phase – The phase of a project in which the scope is refined and the detailed plans for schedule, cost, resources, quality, and risk are developed.
Planning poker – A consensus-based Agile estimation technique in which team members estimate backlog items using numbered cards and discuss differences.
PMO – Project management office. An organizational unit that standardizes project governance processes and supports project delivery through methods, tools, and expertise.
PMO manager – The person who leads the PMO, setting standards, overseeing reporting, and supporting project and portfolio managers.
Porter's five forces – A strategic planning framework for analyzing the competitive forces in an industry: rivalry, threat of new entrants, threat of substitutes, buyer power, and supplier power.
Portfolio – A collection of projects, programs, and operations managed as a group to achieve strategic objectives.
Portfolio balancing – The process of adjusting the mix of projects in a portfolio to balance risk, return, resources, and strategic alignment.
Portfolio charter – A document that authorizes a portfolio and defines its structure, objectives, and governance.
Portfolio governance – The framework, functions, and processes that guide portfolio management decisions and ensure alignment with strategy.
Portfolio manager – The person responsible for managing a portfolio, including selecting, prioritizing, and monitoring its components.
Post-implementation review (PIR) – A review carried out after a project has closed to assess whether it achieved its objectives and benefits, and to capture lessons learned.
PPM software – Project portfolio management software. Tools that help organizations manage demand, projects, resources, finances, and portfolios in one place.
PRINCE2 – Projects in Controlled Environments. A process-based project management method widely used in the UK and internationally, based on seven principles, themes, and processes.
Prioritization – The process of ranking projects, tasks, or requirements by importance, so that resources focus on the most valuable work first.
PRISM – Projects Integrating Sustainable Methods. A sustainability-based project management method from Green Project Management (GPM).
Probability and impact matrix – A grid that rates risks by their probability of occurring and their impact, used to prioritize them. Often shown as a color-coded heat map.
Problem statement – A concise description of the issue that a project aims to address.
Process – A systematic series of activities that produces an end result, such as a product, service, or outcome.
Process architecture – The structural design of an organization’s processes, showing how they relate to each other.
Process decision program chart (PDPC) – A planning tool that maps the steps needed to reach a goal and identifies what could go wrong at each step, along with countermeasures.
Process improvement plan – A plan that describes how project processes will be analyzed to identify activities that enhance their value.
Process management – The practice of designing, monitoring, and improving business processes to make them more effective and efficient.
Procurement management plan – A document that describes how a project will acquire goods and services from outside the organization.
Product – An artifact that is produced, is quantifiable, and can be either an end item in itself or a component item.
Product backlog – An ordered list of everything that is known to be needed in a product. It is the single source of work for a Scrum team.
Product breakdown structure (PBS) – A hierarchical structure that breaks down a final product into its component products. It is central to PRINCE2’s product-based planning.
Product description – A description of a product’s purpose, composition, derivation, and quality criteria.
Product flow diagram – A diagram that shows the sequence in which products are developed and the dependencies between them.
Product life cycle – The stages a product goes through from introduction to growth, maturity, and decline.
Product owner – In Scrum, the person accountable for maximizing the value of the product and for managing the product backlog.
Product portfolio management – The management of a set of products as an investment portfolio, to decide which products to invest in, maintain, or retire.
Product roadmap – A high-level visual plan that shows how a product is expected to evolve over time.
Product verification – The process of checking that a product meets its specification and quality criteria.
Product vision – A statement that describes the long-term purpose and goal of a product and the value it will deliver to users.
Program – A group of related projects, subsidiary programs, and activities managed in a coordinated way to obtain benefits not available from managing them individually.
Program charter – A document that authorizes a program and defines its vision, objectives, scope, and governance.
Program increment (PI) – In SAFe, a timebox, usually 8 to 12 weeks, in which an Agile release train delivers incremental value.
Program management plan – A document that integrates the subsidiary plans of a program and defines how it will be executed, monitored, and controlled.
Program manager – The person responsible for leading a program and achieving its objectives and benefits.
Program performance – A measure of how well a program is delivering its benefits, schedule, and budget commitments.
Program roadmap – A chronological, high-level view of a program’s intended direction, showing major milestones and decision points.
Program strategy – The approach a program will take to deliver its intended benefits and support organizational strategy.
Progress analysis – The evaluation of progress against the plan to identify variances and their causes.
Project – A temporary endeavor undertaken to create a unique product, service, or result.
Project accounting – An accounting method that tracks the financial results of individual projects, including costs, revenues, and billing.
Project assurance – Independent monitoring of project performance and products, on behalf of the project board, to confirm that the project is on track.
Project calendar – A calendar that defines working days, shifts, and holidays for scheduling project activities.
Project charter – A document issued by the sponsor that formally authorizes a project and gives the project manager authority to use resources.
Project collaboration tools – Software that helps project teams communicate, share files, coordinate tasks, and work together in one place, especially when team members are in different locations.
Project coordinator – A team member who supports the project manager with administration, scheduling, documentation, and communication.
Project dashboard – A visual summary of key project information, such as status, progress, budget, risks, and KPIs.
Project director – A senior manager responsible for overseeing one or more large projects, often with accountability for strategic outcomes.
Project health check – A rapid, independent review of a project’s status to identify problems and recommend corrective action.
Project initiation document (PID) – A document that defines a project, its scope, objectives, organization, and approach, and forms the basis for its management and assessment.
Project inventory – A complete list of all current and proposed projects in an organization, used as the starting point for portfolio management.
Project logistics – The planning and coordination of the movement, storage, and supply of materials, equipment, and people for a project.
Project management body of knowledge (PMBOK) – The collection of processes, best practices, terminology, and guidelines for project management published by PMI in the PMBOK Guide.
Project management information system (PMIS) – The tools and systems used to gather, integrate, and distribute project information.
Project management professional (PMP) – A globally recognized project management certification awarded by PMI.
Project manager – The person assigned by the performing organization to lead the team responsible for achieving the project objectives.
Project phase – A collection of logically related project activities that ends with the completion of one or more deliverables.
Project plan review – A formal review of the project plan to confirm it is complete, realistic, and ready for approval.
Project planning – The process of defining a project’s scope, objectives, schedule, budget, resources, and approach.
Project portfolio management (PPM) – The centralized management of an organization’s projects and programs to select, prioritize, and resource the right work in line with strategy.
Project records – The documents, data, and correspondence created during a project and kept as a record.
Project recovery – The actions taken to bring a troubled project back on track.
Project release – The delivery of a version of a product or deliverable to users or customers.
Project risk profile – A summary of the overall risk exposure of a project, showing the type and level of its risks.
Project roadmap – A high-level visual timeline of a project’s major phases, milestones, and deliverables.
Project roles and responsibilities – A definition of who does what on a project, often captured in a RACI matrix.
Project schedule – An output of the schedule model that shows linked activities with planned dates, durations, milestones, and resources.
Project schedule management – The processes required to manage the timely completion of a project. Formerly called project time management.
Project scope – The work performed to deliver a product, service, or result with the specified features and functions.
Project scope statement – A description of the project scope, major deliverables, assumptions, constraints, and exclusions.
Project selection – The process of evaluating and choosing which projects to fund and execute, based on strategic value, cost, risk, and resources.
Project sequencing – The process of identifying and documenting the order in which projects or activities should be performed.
Project sponsor – The person or group that provides resources and support for a project and is accountable for enabling its success.
Project steering committee – A group of senior stakeholders who provide direction, make key decisions, and oversee a project or program.
Project strategy – The approach a project will take to achieve its objectives and contribute to organizational strategy.
Project success criteria – The measurable conditions that must be met for a project to be considered successful.
Project tiers – A classification of projects into levels based on size, complexity, or risk, which determines the governance and controls applied.
Project timeline – A chronological view of project activities and milestones, usually shown as a bar chart or roadmap.
Project work plan – A detailed plan that describes the tasks, responsibilities, and timelines needed to complete the project.
Project-based working – A way of organizing work in which tasks are structured as projects with defined objectives, teams, and timeframes.
Proof of concept (PoC) – A small exercise to test whether an idea, technology, or approach is feasible before committing to full development.
Prototype – An early, working model of a product used to test concepts and gather feedback before final development.
Q – Project Management Terms
Qualitative risk analysis – The process of prioritizing risks by assessing their probability and impact, usually on a descriptive or ordinal scale.
Quality – The degree to which a set of inherent characteristics fulfills requirements.
Quality assurance (QA) – The planned and systematic activities that give confidence that a project will meet its quality requirements, focused on processes.
Quality audit – A structured, independent review to determine whether project activities comply with quality policies, processes, and procedures.
Quality control (QC) – The process of monitoring and recording the results of quality activities to assess deliverables and recommend necessary changes, focused on outputs.
Quality criteria – The measurable characteristics a deliverable must meet to be accepted.
Quality gates – Checkpoints in a project or development process where deliverables must meet defined quality criteria before moving to the next stage.
Quality management – The processes for planning, managing, and controlling quality to meet stakeholder requirements.
Quality management plan – A document that describes how quality policies, standards, and procedures will be applied and verified on a project.
Quantitative risk analysis – The process of numerically analyzing the combined effect of identified risks on project objectives, often using Monte Carlo simulation.
Quarterly planning – A planning cycle in which priorities, objectives, and capacity are set and reviewed every three months.
Quick wins – Improvements that can be delivered quickly and with little effort, to show early value and build momentum.
R – Project Management Terms
RACI/RASCI matrix – A responsibility assignment matrix that shows who is responsible, accountable, consulted, and informed for each task. RASCI adds a supportive role.
RAID log – A single log that tracks a project’s risks, assumptions, issues, and dependencies (or decisions).
R&D – Research and development. The activities organizations undertake to create new knowledge, products, or processes.
Release train engineer (RTE) – In SAFe, the servant leader and coach of an Agile release train, who facilitates its events and processes.
Remediation plan – A plan of actions to correct a problem, gap, or non-compliance and prevent it from recurring.
Request for proposal (RFP) – A document issued by a buyer to invite vendors to submit proposals for providing a product or service.
Request for quotation (RFQ) – A document used to request price quotes from potential suppliers for clearly defined goods or services.
Request form – A standard form used to submit a new project or work request for review and approval.
Requirements – The conditions or capabilities that a product, service, or result must have to meet a business need.
Requirements analysis – The process of examining requirements to check that they are clear, complete, consistent, and feasible.
Requirements baseline – The approved set of requirements at a point in time, used as the basis for development and change control.
Requirements gathering – The process of eliciting, collecting, and documenting stakeholder needs and requirements.
Requirements management – The process of documenting, analyzing, tracing, prioritizing, and controlling changes to requirements.
Requirements management plan – A document that describes how requirements will be analyzed, documented, and managed throughout a project.
Requirements prioritization – The process of ranking requirements by value, urgency, or risk to decide which should be delivered first.
Requirements traceability matrix (RTM) – A table that links each requirement to its origin and traces it through design, development, and testing.
Requirements validation – The process of confirming with stakeholders that the documented requirements reflect their actual needs.
Reserve – A provision of time or money in the project plan to mitigate cost or schedule risk. (See also contingency reserve and management reserve)
Resource allocation – The assignment of available resources to project activities.
Resource availability – The time periods during which a resource can be assigned to work.
Resource breakdown structure (RBS) – A hierarchical list of the resources needed for a project, grouped by category and type.
Resource calendar – A calendar that shows the working days, shifts, and availability of each resource.
Resource demand – The quantity and type of resources needed to carry out project or portfolio work over time.
Resource dependency – A dependency that exists because two activities need the same resource.
Resource forecasting – The process of predicting future resource needs based on planned and pipeline work.
Resource histogram – A bar chart that shows the amount of a resource required or scheduled over time.
Resource leveling – A technique that adjusts start and finish dates to balance resource demand with supply, which may extend the project duration.
Resource management – The process of planning, allocating, and scheduling people, equipment, and materials across projects and operations.
Resource management plan – A document that describes how project resources will be acquired, allocated, managed, and released.
Resource optimization techniques – Techniques, such as resource leveling and resource smoothing, used to adjust activity dates so that resource demand matches supply.
Resource over-allocation – A situation in which a resource is assigned more work than it can complete in the available time.
Resource planning – The process of identifying the resources needed for a project and when they will be needed.
Resource pool – A group of resources, such as people with similar skills, that can be assigned to projects as needed.
Resource scheduling – The process of setting the dates on which resources will work on specific activities.
Resource shortage – A situation in which demand for a resource exceeds its availability.
Resource smoothing – A technique that adjusts activities within their float so that resource demand stays within limits, without changing the project end date.
Resource utilization – The percentage of a resource’s available time that is spent on productive work.
Resource-driven activity durations – Activity durations that are calculated from the amount of work and the number of resources assigned.
Retrospective – A meeting held at the end of an iteration or project in which the team reflects on what went well and what to improve.
Return on investment (ROI) – A measure of profitability calculated as the net gain from an investment divided by its cost.
Re-work – Work done to correct defects or bring a deliverable into compliance with requirements.
Risk – An uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives.
Risk acceptance – A risk response strategy in which the team acknowledges a risk but decides not to act unless it occurs.
Risk assessment – The process of identifying and analyzing risks to understand their probability, impact, and priority.
Risk breakdown structure (RBS) – A hierarchical representation of risks grouped by category and subcategory.
Risk burndown chart – A chart that shows how total risk exposure decreases over time as risks are mitigated or closed.
Risk categorization – The grouping of risks by source, area affected, or other categories to identify areas of greatest exposure.
Risk driver – An underlying factor or condition that causes or increases a risk.
Risk efficiency – The concept of achieving the best balance between the level of risk taken and the expected return.
Risk enhancement – A response strategy for opportunities that increases their probability or positive impact.
Risk exploitation – A response strategy for opportunities that seeks to make sure the opportunity is realized.
Risk exposure – The combined measure of the probability and impact of a risk, or of all risks on a project.
Risk identification – The process of finding and documenting the risks that could affect a project.
Risk impact – The effect a risk would have on project objectives if it occurred.
Risk management – The processes of planning, identifying, analyzing, responding to, and monitoring project risks.
Risk management framework – A structured set of principles, roles, and processes that defines how risk is managed across an organization.
Risk management plan – A document that describes how risk management activities will be structured and performed on a project.
Risk mitigation – A response strategy that reduces the probability or impact of a threat.
Risk monitoring and control – The process of tracking identified risks, monitoring residual risks, identifying new risks, and evaluating the effectiveness of responses.
Risk owner – The person responsible for monitoring a risk and making sure the agreed response is carried out.
Risk probability – The likelihood that a risk will occur.
Risk ranking – The ordering of risks by priority, usually based on their probability and impact scores.
Risk register – A document that records identified risks, their analysis, owners, responses, and status.
Risk response – An action taken to address a risk, such as avoid, mitigate, transfer, or accept for threats, or exploit, enhance, share, or accept for opportunities.
Risk response planning – The process of developing options and actions to enhance opportunities and reduce threats.
Risk threshold – The level of risk exposure above which a risk must be addressed or escalated.
Risk tolerance – The degree of uncertainty that an organization or individual is willing to accept.
Risk transference – A response strategy that shifts the impact of a threat to a third party, for example through insurance or a contract.
Risk trigger – An event or condition that indicates a risk is about to occur or has occurred.
Roll out – The process of deploying a new product, system, or process to users, often in stages.
Rolling wave planning – An iterative planning technique in which near-term work is planned in detail and later work is planned at a higher level.
Root cause analysis (RCA) – A technique used to find the underlying cause of a problem, rather than its symptoms, so that it can be prevented from recurring.
S – Project Management Terms
SAFe – Scaled Agile Framework. A set of organizational and workflow patterns for implementing Agile practices at enterprise scale.
Schedule baseline – The approved version of the schedule model, used as the basis for comparison with actual results.
Schedule development – The process of analyzing activity sequences, durations, resource requirements, and constraints to create the project schedule.
Schedule feasibility – An assessment of whether a project can realistically be completed within the required timeframe.
Schedule model – A representation of the plan for executing project activities, including durations, dependencies, and other data, used to produce the schedule.
Schedule performance index (SPI) – A measure of schedule efficiency calculated as earned value divided by planned value. An SPI below 1 means the project is behind schedule.
Schedule risk analysis – An analysis of how uncertainties in activity durations may affect the project completion date, often using Monte Carlo simulation.
Schedule variance (SV) – The difference between earned value and planned value. A negative value means the project is behind schedule.
Scope baseline – The approved version of the scope statement, work breakdown structure, and WBS dictionary.
Scope creep – The uncontrolled expansion of project scope without adjustments to time, cost, and resources.
Scope definition – The process of developing a detailed description of the project and product scope.
Scope management plan – A document that describes how the scope will be defined, developed, monitored, controlled, and validated.
Scope validation – The process of formally accepting the completed project deliverables.
Scrum – An Agile framework in which a small team delivers work in fixed-length sprints, guided by defined roles, events, and artifacts.
Scrum board – A visual board that shows the sprint backlog items and their status during a sprint.
Scrum master – The person accountable for establishing Scrum, coaching the team, and removing impediments to its progress.
Sensitivity analysis – A technique that determines which risks or variables have the most potential impact on a project’s outcome.
Service level agreement (SLA) – A contract or agreement that defines the level of service a provider will deliver, such as response and resolution times.
Skill gap analysis – An assessment of the difference between the skills an organization or team needs and the skills it currently has.
Sprint backlog – The set of product backlog items selected for a sprint, plus the plan for delivering them and the sprint goal.
Sprint goal – The single objective a Scrum team commits to achieving during a sprint.
Sprint planning – An event at the start of a sprint in which the team decides what it will deliver and how.
Sprint review – An event at the end of a sprint in which the team presents the completed work to stakeholders and gathers feedback.
Stakeholder – An individual, group, or organization that may affect, be affected by, or perceive itself to be affected by a project.
Stakeholder analysis – The process of identifying stakeholders and assessing their interests, influence, and expectations, to decide how to engage them.
Stakeholder engagement – The process of communicating and working with stakeholders to meet their needs and encourage their involvement.
Stakeholder engagement plan – A document that describes the strategies and actions needed to promote productive involvement of stakeholders.
Stakeholder management – The ongoing process of identifying, analyzing, engaging, and maintaining relationships with stakeholders.
Stakeholder mapping – A visual technique, such as a power and interest grid, used to classify stakeholders by their influence and interest.
Stakeholder register – A document that lists project stakeholders, their roles, interests, and engagement levels.
Statement of work (SOW) – A narrative description of the products, services, or results to be delivered under a contract or project.
Status report – A regular report that describes where a project stands in terms of progress, schedule, budget, risks, and issues.
Strategic alignment – The degree to which projects and portfolios support the organization’s strategic goals.
Strategic management – The ongoing process of setting an organization’s direction, making decisions, and allocating resources to achieve its goals.
Strategic objective – A high-level goal that an organization aims to achieve to fulfill its mission and vision.
Strategic planning – The process of defining an organization’s strategy and making decisions on how to allocate resources to pursue it.
Strategic portfolio management (SPM) – An approach that connects strategy to execution by managing projects, products, and investments as a single portfolio aligned to business outcomes.
Strategic sourcing – A procurement approach that analyzes spending and suppliers to get the best long-term value.
Strategy execution – The process of turning strategic plans into actions and results through projects, programs, and operations.
Strategy map – A visual tool that shows how strategic objectives connect across the perspectives of a balanced scorecard.
Subject matter expert (SME) – A person with deep knowledge of a specific area who provides input to a project.
Supply chain management – The management of the flow of goods, services, and information from suppliers to customers.
SWOT analysis – A strategic planning framework for assessing an organization’s or project’s strengths, weaknesses, opportunities, and threats.
T – Project Management Terms
Target completion date – The date on which an activity or project is planned to be completed.
Target start date – The date on which an activity or project is planned to start.
Task – A defined unit of work that must be completed as part of a project.
Task analysis – The process of breaking down a task into its steps to understand how it is done and what is needed to complete it.
Task lead time – The time from when a task is requested or created until it is completed. In scheduling, lead can also refer to the time a successor can start before its predecessor finishes.
Team velocity – The amount of work, usually in story points, that an Agile team completes in an iteration.
Technical debt – The future cost of rework caused by choosing a quick or limited solution now instead of a better approach.
Technical requirement – A requirement that describes the technical conditions a solution must meet, such as platforms, integrations, or standards.
Time chainage diagram – A chart used in linear projects that plots activities by time on one axis and location or distance on the other.
Time tracking – The process of recording the time people spend on tasks and projects.
Timebox – A fixed, agreed period of time within which a goal or activity must be completed.
Time-scaled network diagram – A network diagram drawn against a time scale, so that activity bars show both logic and duration.
Timesheet – A record of the hours a person has worked on each task or project during a period.
Total cost of ownership (TCO) – The total cost of acquiring, operating, and maintaining an asset over its full life.
Total quality management (TQM) – A management approach in which the whole organization focuses on continuous quality improvement and customer satisfaction.
Transformation program – A program that delivers fundamental change to how an organization operates, often across its people, processes, and technology.
U – Project Management Terms
Use case – A description of how a user interacts with a system to achieve a specific goal.
Use case diagram – A diagram that shows the actors, use cases, and relationships for a system.
User acceptance testing (UAT) – The final testing phase in which end users confirm that a system meets their requirements before it goes live.
User experience (UX) – The overall experience a person has when using a product, including its usability, accessibility, and design.
User requirements – Statements of what users need a system to do, written from the user’s perspective.
User story – A short description of a feature from the user’s perspective, often written as “As a [user], I want [goal] so that [benefit].”
V – Project Management Terms
Value – The worth, importance, or usefulness of something to a stakeholder, often expressed as benefits relative to cost.
Value chain analysis – A strategic planning framework by Michael Porter that analyzes an organization’s primary and support activities to find sources of competitive advantage.
Value engineering – A systematic method for improving the value of a product or project by examining functions and reducing cost without lowering performance.
Value for money ratio – A measure that compares the benefits delivered by a project with the resources used to achieve them.
Value management – A structured approach to defining what value means to an organization and maximizing it throughout a project.
Value management office (VMO) – An evolution of the PMO that focuses on measuring and maximizing the business value delivered by projects and portfolios.
Value proposition – A clear statement of the benefits a product or service delivers and why customers should choose it.
Value stream – The sequence of steps an organization uses to deliver value to a customer, from request to delivery.
Value stream mapping – A Lean technique that visualizes the flow of materials and information through a value stream to identify waste.
Value tree – A hierarchical diagram that breaks down an organization’s high-level value drivers into measurable components.
Value-based management – A management approach that aligns decisions and processes with maximizing shareholder value.
Variable – A factor that can change and affect the outcome of a project, model, or analysis.
Variance analysis – A technique for determining the cause and degree of difference between the baseline and actual performance.
Velocity chart – A chart that shows the amount of work an Agile team has completed in each iteration.
Version control – A system that records changes to files over time so that specific versions can be recalled and changes tracked.
Vision statement – A statement describing the future state an organization or initiative aims to achieve.
Voice of the customer (VOC) – A process for capturing customers’ needs, expectations, and preferences to guide product and project decisions.
VRIO framework – A strategic planning tool for analyzing whether a resource gives competitive advantage by assessing whether it is valuable, rare, inimitable, and organized to capture value.
W – Project Management Terms
Waterfall – A sequential project approach in which each phase, such as requirements, design, build, and test, is completed before the next begins.
Weighted scoring model – A technique for evaluating and prioritizing projects or options by scoring them against weighted criteria.
What-if scenario analysis – The process of evaluating scenarios to predict their effect on project objectives, such as cost, schedule, or resource capacity.
Work breakdown structure (WBS) – A hierarchical decomposition of the total scope of work into smaller, manageable deliverables and work packages.
Work package – The lowest level of the WBS, for which cost and duration can be estimated and managed.
Work units – Measures used to quantify the effort required for work, such as hours, days, or story points.
Workaround – An immediate response to a problem or risk that has occurred, for which no response was planned.
Workstream – A logical grouping of related project activities, often led by one person or team.
Frequently Asked Questions About Project Management Terms
How many project management terms are included in this glossary?
This glossary includes 581 project management terms and definitions, organized alphabetically from A to Z. It provides clear, concise explanations of essential concepts used in project management, helping professionals quickly find and understand key terminology.
What types of project management terminology are covered?
The glossary covers traditional, Agile, and hybrid project management terminology, including PMBOK, PRINCE2, Scrum, Kanban, SAFe, project portfolio management (PPM), resource planning, risk management, project governance, and strategic management.
What are the most common project management acronyms?
Common project management acronyms include PMO (Project Management Office), PPM (Project Portfolio Management), WBS (Work Breakdown Structure), EVM (Earned Value Management), KPI (Key Performance Indicator), and RACI (Responsible, Accountable, Consulted, and Informed).
Why is understanding project management terminology important?
Understanding project management terminology helps teams communicate clearly, define responsibilities, manage risks, and make informed decisions. A shared vocabulary also improves collaboration, project governance, and alignment between project execution and business objectives.